Smallest site in London sees crane and sheet pilling
This post has already been read 984 times!
Machinery specialist AGD Equipment places pant on one of the smallest sites in London squeezed on two piling rigs and a crawler crane which had to work in the tiny space near Vauxhall Bridge in London the site is extremely small as you can see.
AGD managing director Robert Law commented saying: “The job redefined the term ‘restricted access’ and was one of the smallest sites we’ve ever supplied.
“Our kit helped install two sheet piled basement walls for Zalman Properties.
“Due to the dense gravels and hard clay a compact Soiltek S80-CFA rig was deployed to pre auger the soil ahead of the sheet pile installation which was done with a Giken F201 silent piler. It was serviced by a Sennebogen 643R 40 tons telescopic crawler crane.
“All of the equipment was supplied with experienced operators and Tier 4 engines to meet the emission standards for this part of London.”